InfiToken

GPU capacity in Japan · Go-live August 2027

Dedicated NVIDIA GB300 racks in Japan, on fixed pricing for 3–5 years.

We're building liquid-cooled GPU sites in Japan where the grid connection is already confirmed by the utility. Reserve whole NVL72 racks now. Reservations are non-binding.

864GB300 GPUs per site
12NVL72 racks per site
≈1.06annual PUE (design), fully liquid-cooled
Aug 2027first two sites go live

Why reserve now

Power is the bottleneck. We already have it.

New data-center connections around Tokyo and Osaka queue for years. Our 2 MW sites sit in regions where the utility has already replied that it can supply power, so the racks get built on a fixed schedule.

Grid connection confirmed

Utility supply replies in hand for each site. No multi-year queue.

Fixed price, fixed capacity

Rack-level contracts for 3–5 years. Your price and allocation don't move.

Data stays in Japan

Dedicated, physically separated racks. Useful for co-productions with Japanese studios.

Built in about 8 months

Factory-built container modules, assembled on site while civil works run in parallel.

Specifications

One standard 2 MW site, repeated.

Compute12 × NVIDIA GB300 NVL72 (864 GPUs), 72 GPUs per NVLink domain
IT loadAbout 1,722 kW per site; site demand under 2 MW
CoolingDirect liquid cooling with closed-circuit cooling towers; dry operation below about 15 °C outside
EfficiencyDesign PUE about 1.06 annual average, 1.09 at peak
Power pathA feed through UPS with lithium-ion batteries; B feed from the grid
BuildSix 40 ft container modules per site, single storey
LocationsChubu (Aichi Prefecture) and Kyushu (Kagoshima Prefecture), Japan
ServiceDedicated rack clusters; bare-metal access; network and storage specified with each customer

Availability, stated plainly. To keep cost and build time down there are no diesel generators. Batteries carry the site through short outages; if a grid outage lasts more than about 20 minutes, jobs are checkpointed and the GPUs shut down in order. That suits training, rendering and batch generation. It isn't designed for always-on, latency-critical inference.

Sites

Two sites first, more behind them.

August 2027

Chubu · Aichi

2 MW, 12 NVL72 racks. Grid supply in about four months from order.

August 2027

Kyushu · Kagoshima

2 MW, 12 NVL72 racks. Built in parallel with Chubu.

2028 onward

Further sites

Two more 2 MW sites with grid replies, and about ten more in review, including one up to 30 MW.

Pricing

Indicative pricing, before tax.

Final pricing depends on the number of racks, the term and payment terms. Reserving now holds this range.

Dedicated cluster

3–5 year term, whole NVL72 racksfrom ¥650per GPU-hour (about $4.20)
  • Price fixed for the full term
  • 3–6 months prepaid, then monthly
  • Physically separated racks

Short-term reservation

3–12 monthsfrom ¥900per GPU-hour (about $5.80)
  • Peaks and project work
  • Billed monthly
  • Subject to free capacity

Power and facility only

Bring your own GPUson requestper kW per month
  • 2 MW of power and liquid cooling
  • Operations and maintenance on site
  • For GPU clouds with their own hardware

Who it's for

Built for long-running GPU work.

Film, VFX and animation

Rendering, generative-AI shots and custom style models, with footage and models kept in Japan.

GPU clouds and AI companies

Wholesale rack capacity or power-and-facility space when you're short of megawatts.

University labs

Annual reservations that fit grant and fiscal-year budgets, dedicated or shared racks.

Team

AI, infrastructure and Japanese grid experience.

HZ

Howard Zou

CEO

Twelve years in AI, from machine learning to deep learning. Founder of an AI software company.

PP

Peter Pan

CTO

Software engineering and data-center infrastructure. Founder of a software company.

XS

Xiao Sun

COO · Tokyo

Solar, storage and data-center projects in Japan, from grid connection and permits to commissioning, across Hokkaido, Akita, Aomori, Nagano and Fukuoka.

Timeline

From reservation to running jobs.

  1. Nov–Dec 2026Non-binding reservations; financing closes
  2. Jan 2027Construction starts; long-lead equipment and GPUs ordered
  3. Jun 2027Modules on site, power on
  4. Aug 2027Racks live; customer acceptance and billing start

Reserve capacity

Tell us what you need.

A reservation is not a contract. It holds a place in the allocation and the price range above. We'll reply within two business days, and send a short letter of intent if you'd like to firm it up.

Prefer email? hello@infitoken.com

Workloads

Thank you — we've got it.

We'll reply from hello@infitoken.com within two business days.

FAQ

Common questions.

Is a reservation binding?

No. It's an expression of interest. Binding terms are only set in a service agreement, which we'd sign closer to go-live.

Why Japan rather than a US cloud?

Long-term pricing well below on-demand GB300 list prices, a confirmed build schedule, and data residency in Japan, which matters for work with Japanese studios and partners.

What about latency from the US or Europe?

Round trips across the Pacific add on the order of 100 ms. That doesn't affect training, rendering or batch jobs. Large data sets can move over dedicated links or by bulk transfer.

Content security for unreleased film work?

Racks are dedicated and physically separated. For studios that require it, we plan to complete an MPA Trusted Partner Network assessment before go-live.

Can universities pay annually?

Yes. Annual reservations are available and can be timed to grant or fiscal-year budgets.